From Wikipedia: A "perfect storm" is an expression that describes an event where a rare combination of circumstances will aggravate a situation drastically. The term is also used to describe an actual phenomenon that happens to occur in such a confluence, resulting in an event of unusual magnitude.
------------------------------------------------------
An inedible recipe: Skagit River bridge collapse. Coal trains for export. Normal events: commuting, business, EMS, school buses, bike rides, Tulip Festival. Public expense. Private exemption.
-------------------------------------------------------
The past 10 days has seen me travel I-5 to Seattle twice for medical purposes, during which I also experienced the traffic delays caused by the Skagit River bridge's collapse. That little boo-boo was simply caused by an over sized truck colliding with the bridge structure. Of course, the public will pay for rebuilding the bridge, both in terms of government funding and its own inconvenience - including cumulative loss of business and personal time. That is to be expected. But, the unintended consequences of this accidental event caused me to think about how sensitive we are to compounded problems which radiate from such catastrophes.
For example, the detours required to bypass the I-5 bridge travel through adjacent areas that are unaccustomed and unequipped for the volume of traffic, making these alternatives more dangerous as well as slower. Also, the main detour to the west must cross the Skagit River downstream, in constricted Mt Vernon streets, before having to cross the BNSF mainline -at grade- to return to I-5. That creates other problems that also depend on train traffic. See how things can snowball and escalate to larger proportions?
Now, let's turn back to the proposed GPT proposal that carries with it the prospect of up to 18 additional 1.5 -mile long coal trains per day. Many of the EIS comments submitted cited the inconvenience, danger, and major capital funding necessary to alleviate these problems. Guess what, unexpected events like the Skagit River bridge collapse would/will greatly compound the problem of dealing with many more trains! It is this compounding effect that must be anticipated and dealt with effectively and up-front.
Similar thinking was involved with restarting the Olympic Pipe Line after the disaster that occurred back in 1999.
The concept of applied 'Process Safety Management' was required of the owner/operator before permission was granted to rebuild/restart the pipeline. That took 18 months to satisfy, but the result was a much safer operation that takes into account most of the events -or sequence of events- that could lead to another leak and explosion. I believe the wait was well-worth the additional safety and public confidence.
Because we are an integrated society, it is fitting that public infrastructure be the responsibility of government, which in turn gains its authority and funding through the public - including private enterprise. However, if private enterprise demands higher privileges regarding infrastructure than it is willing to pay for, then additional considerations must be extracted from it. In the case of coal trains, that should include the costs of grade-separated crossings wherever feasible. Why not include these costs as part of the cost of shipping?
You know, those who benefit, pay.
Floyd McKay has contributed two more articles on Crosscut, called the Tale of Two Cities. The first deals with the City of Ferndale, which seems to see the proposed GPT Coal Terminal through mostly rose-colored glasses; the second deals with the City of Burlington, which sees some real problems with GPT, without rose glasses.
The Skagit River bridge collapse provides a lens through which we can see real life scenarios that are with us now. It doesn't take much imagination to see how much 18 additional coal trains per day would grossly compound such problems, does it? Let's cut out the wishful thinking on GPT and get on with anticipating real problems and their solutions instead.
Showing posts with label Transportation. Show all posts
Showing posts with label Transportation. Show all posts
Saturday, June 15, 2013
Sunday, December 9, 2012
Coal: GPT EIS Comment No. 31
Concerns Based on Reality
Several recent events and actions lend credence to concerns by citizens, including these:
• The coal conveyor & access damage at the nearby Westshore Coal Terminal in BC resulting from a late night collision by a large Bulk Carrier vessel with a pilot on board.
• The railroad bridge collapse south of Bellingham on the BNSF main line used by heavy coal trains.
• The derailment of a coal train east of Tri-Cities, spilling 34 loaded cars.
• The protracted delays of traffic in Skagit County due to a stalled coal train with brake problems.
• The unseemly acts by the GPT Applicant to recruit allies to pack public meetings designed to gather citizen concerns.
• The repeated dismissals of legitimately expressed citizen concerns as only NIMBYism by GPT spokespersons.
• The ongoing media advertising campaign designed to influence public opinion during the 120-day EIS Scoping period, which advocates multiple coal terminals -not just GPT- which seems like a concerted effort on behalf of an entire industry. Doesn't that justify a programmatic EIS approach is necessary?
There is likely available statistical information on the frequency and severity of both large bulk vessel and coal train accidents. I request that this information be researched and applied to the rail and marine traffic projected by the Applicant for GPT.
Additionally, the costs to the natural environment, existing businesses, residents, governments services and facilities need to be ascertained for inclusion into the EIS evaluation.
A programmatic EIS appears necessary to include all of the possible impacts, whether to the GPT site or anywhere along the proposed transport routes.
It would also include impacts to the atmosphere, the oceans and inland waterways, the land, human health and impacts to each ecosystem likely to be affected over time.
Several recent events and actions lend credence to concerns by citizens, including these:
• The coal conveyor & access damage at the nearby Westshore Coal Terminal in BC resulting from a late night collision by a large Bulk Carrier vessel with a pilot on board.
• The railroad bridge collapse south of Bellingham on the BNSF main line used by heavy coal trains.
• The derailment of a coal train east of Tri-Cities, spilling 34 loaded cars.
• The protracted delays of traffic in Skagit County due to a stalled coal train with brake problems.
• The unseemly acts by the GPT Applicant to recruit allies to pack public meetings designed to gather citizen concerns.
• The repeated dismissals of legitimately expressed citizen concerns as only NIMBYism by GPT spokespersons.
• The ongoing media advertising campaign designed to influence public opinion during the 120-day EIS Scoping period, which advocates multiple coal terminals -not just GPT- which seems like a concerted effort on behalf of an entire industry. Doesn't that justify a programmatic EIS approach is necessary?
There is likely available statistical information on the frequency and severity of both large bulk vessel and coal train accidents. I request that this information be researched and applied to the rail and marine traffic projected by the Applicant for GPT.
Additionally, the costs to the natural environment, existing businesses, residents, governments services and facilities need to be ascertained for inclusion into the EIS evaluation.
A programmatic EIS appears necessary to include all of the possible impacts, whether to the GPT site or anywhere along the proposed transport routes.
It would also include impacts to the atmosphere, the oceans and inland waterways, the land, human health and impacts to each ecosystem likely to be affected over time.
Labels:
Coal,
Energy,
Environment,
Government,
Healthcare,
Politics,
Stormwater,
Taxes,
Transportation,
Waterfront
Tuesday, May 8, 2012
Coal: Creating Private Wealth Offset By Public Debt
I remember learning somewhere, long ago, that energy can neither be created nor destroyed.
Then, along came Albert Einstein who showed how matter and energy are in fact related, and even interchangeable under the right conditions.
Think e=mc[squared]
Lately, I've been reminded that the earth was given its entire allotment of water at the time of its creation, and its now up to us to learn how to use it; hopefully, more efficiently and effectively with fair and equitable pricing mechanisms including a large dose of conservation!
The same may be said about coal and other natural resources, many of which are not easily sustainable.
The same may be said about coal and other natural resources, many of which are not easily sustainable.
How do these concepts relate to our current little problem of dealing with the Gateway Pacific Terminal proposal and its dependency on hauling enormous amounts of our nation's coal along railways that bisect and disrupt and pollute American communities all along the way?
Well, one way is that we the people ought to have a very strong voice in any decisions that impact our lives and our wallets!
There is growing evidence that many people have already waked up to that realization and are making their concerns public. I'm glad this is happening and happy to add my own voice in reflecting what others are saying and writing.
Another way the earlier concepts relate to us is that the proposal carries with it the promise of imposing an involuntary and unnecessary tax on every one of us, if the GPT proposal were to be approved in its present form. That ought to get everyone's undivided attention, whether a GPT advocate or not! If it doesn't, you are either brain-dead or anticipating a private payoff of some kind.
But, enough of my editorializing and on to the recent written thoughts of others:
-----------------------------------
The Bellingham Herald deserves credit for its reporting coverage of the growing GPT debate, with these citations;
First, the Whatcom Democrats met and approved a resolution against GPT.
Then, this report of BNSF's desire to add more sidings along our waterfront.
Today brought this article on last night's presentation to the City Council by the organization CommunityWise.
From Crosscut, new articles are coming thick and fast from Floyd MacKay:
1 - Coal train impacts to Boulevard Park
2 - Coal train impacts to Passenger service, etc, per CommunityWise report to City Council
3 - Coal train impacts to Pacific NW - PGE says no to use of property as terminal
4 - A brief plaudit to Mssrs MacKay and Simmons for their Coal train coverage to date; mention of Robert F Kennedy, Jr address in Portland about coal.
[an excerpt]
1 - Coal train impacts to Boulevard Park
2 - Coal train impacts to Passenger service, etc, per CommunityWise report to City Council
3 - Coal train impacts to Pacific NW - PGE says no to use of property as terminal
4 - A brief plaudit to Mssrs MacKay and Simmons for their Coal train coverage to date; mention of Robert F Kennedy, Jr address in Portland about coal.
[an excerpt]
A little celebrity, now and then, is a good thing. As Billy Frank, Jr. learned during the Indian fishing wars of the 1960s and 70s, corralling a star like Marlon Brando to participate enhances media exposure. In the battle over Northwest coal exports — a debate expertly covered by Crosscut's Floyd McKay and Bob Simmons — a celebrity or two could be a political boon. So why not import a Kennedy to speak truth to power (and add a bit of glam)? "Several hundred activists gathered in Pioneer Courthouse Square today [May 1] to rally against exporting Montana and Wyoming coal from Northwest ports, an effort to signal the industry that it's in for a no-holds-barred fight," the Oregonian'sScott Learn writes. "Robert F. Kennedy, Jr., chief prosecuting attorney for Hudson Riverkeeper and president of the Waterkeeper Alliance, took top billing. Based on his experience fighting coal mining in Appalachia, Kennedy told the crowd, coal would corrupt politicians, damage health and the environment and 'turn government agencies into the sock puppets of the industries they're supposed to regulate.'"
The Blogsite Get Whatcom Planning has new posts on Coal Trains, yesterday and today. Check them out.
=================================
Finally, as the major player in the foregoing debate, the kindly Mr Warren Buffet has a few things to say - indirectly:
Finally, as the major player in the foregoing debate, the kindly Mr Warren Buffet has a few things to say - indirectly:
More on Berkshire Hathaway:
Berkshire Hathaway's 2011 Annual Report contains some interesting information about BNSF Railway Company, specifically on pages 10, 11 and 70.
As excerpted and condensed from page 11:
Revenues grew from $16.850 Billion in 2010 to $19.548 Billion in 2011
Operating earnings grew from $4.495 Billion in 2010 to $5.310 in 2011
Net Interest grew from $507 Million in 2010 to $560 Million in 2011
Pre-Tax earnings grew from $3.988 Billion in 2010 to $4.741 in 2011
Net earnings grew from $2.459 Billion in 2010 to $2.972 Billion in 2011
Excerpted from page 10:
An excerpt - BNSF [headquartered in Fort Worth, TX; 39,000 employees] is a very large business that is both regulated and capital intensive.
A key characteristic… is the huge investment [it has] in very long-lived, regulated assets, with these partially funded by large amounts of debt that is not guaranteed by Berkshire [whose credit is not needed]. [The business has] earning power that even under terrible business conditions amply covers [its] interest requirements. In a less than robust economy during 2011, for example, BNSF's interest coverage was 9.5x….
Measured by ton-miles, rail moves 42% of America's inter-city freight, and BNSF moves more than any other railroad - about 37% of the industry total. A little math will tell you that about 15% of all inter-city ton-miles of freight in the U.S. is transported by BNSF. It is no exaggeration to characterize railroads as the circulatory system of our economy. Your railroad is the largest artery. [our aorta?]
All of this places a huge responsibility on us. We must, without fail, maintain and improve our 23,000 miles of [owned] track along with 13,000 bridges, 80 tunnels, 6900 locomotives and 78,600 freight cars. This job requires us to have ample financial resources under all economic scenarios and to have the human talent that can instantly and effectively deal with the vicissitudes of nature, such as the widespread flooding BNSF labored under last summer.
To fulfill its societal obligation, BNSF regularly invests in far more than its depreciation charge, with the excess amounting to $1.8 billion is 2011. The three other major U.S. railroads are making similar outlays. Though many people decry our country's inadequate infrastructure spending, that criticism cannot be levied against the railroad industry. It is pouring money - funds from the private sector - into the investment projects needed to provide better and more extensive services in the future. If railroads were not making these huge expenditures, our country's publicly-financed highway system would face even greater congestion and maintenance problems than exist today.
Massive investments of the sort that BNSF is making would be foolish if it could not earn appropriate returns on the incremental sums it commits. But I am confident it will do so because of the value it delivers. Many years ago Ben Franklin counseled, "Keep thy shop, and thy shop will keep thee." Translating this to our regulated businesses, he might say, "Take care of your customer, and the regulator - your customer's representative - will take care of you." Good behavior by each party begets good behavior in return.
Excerpted from page 70 [Management's discussion]:
Railroad ("Burlington Northern Santa Fe")
We acquired [100%- had previously owned 22.5%] control of Burlington Northern Santa Fe Corporation including its subsidiary BNSF Railway Company, ("BNSF") on February 12, 2010. BNSF's revenues and operating results are included in our consolidated results beginning immediately after the acquisition. Prior to that date, we accounted for our investment in BNSF pursuant to the equity method. …….
[ insert revenues and operating results, as summarized above]
---------------------------------------
---------------------------------------
BNSF operates one of the largest railroad systems in North America with approximately 32,000 route miles of track in 28 states and two Canadian provinces. BNSF's major business groups are classified by product shipped and include consumer products, coal, industrial products and agricultural products. The following discussion compares BNSF's results for the years ending December 31, 2011, 2010 and 2009.
Revenues for the year ending December 31, 2011 were approximately $19.5 billion, representing an increase of approximately $2.7 billion (16%) over 2010. Revenues from each of the four business groups increased between 8% and 19% as compared to 2010. Overall, the increases in revenues in 2011 reflected a 12% increase in average revenues per car/unit across all four business groups, as well as a 3% increase in the volume of cars/units handled. Revenues in each period include fuel surcharges to customers under programs intended to recover incremental fuel costs when fuel prices exceed threshold fuel prices. Average revenues per car/unit in 2011 included the effects of fuel surcharge increases of 35% as compared to 2010.
The 3% increase in volume is comprised of increases of 7% in cars/units handled in the consumer products and industrial products groups combined with a 4% decrease in volume for coal products. The consumer products volume increase was attributable primarily to higher domestic intermodal and international volume. The decline in coal unit volume was partially attributable to the impacts of severe flooding along key coal routes. Industrial products volume increased primarily as a result of increased steel and sand shipments, as well as increased demand in petroleum products. Agricultural product volume remained relatively unchanged, as higher wheat exports and U.S. corn shipments were mostly offset by declining soybean exports.
Operating expenses in 2011 were $14.2 billion, representing an increase of $1.9 billion (15%) over 2010. Fuel expenses increased $1.3 billion in 2011 primarily due to higher fuel prices. The remainder of the increase in fuel costs was driven by higher overall freight volumes and severe weather conditions, which negatively impacted efficiency. Compensation and benefits expenses increased $311 million, reflecting volume-related costs, as well as salaries and benefits inflation, increased personnel training costs and flood-related costs. Purchased services expenses increased $49 million due primarily to volume-related and flood-related costs. In 2010, purchased services also included one-time merger-related legal and consulting fees. Materials and other expenses increased $186 million, reflecting higher locomotive and freight car material costs and increased crew transportation, travel and casualty costs offset by lower environmental costa.
[omitted 2 paragraphs related to prior year results]
-----------------------------------------------------
As a last thought, I am again listing my post of April 30, 2012, that lists all of my previous blogs on the subject of Coal.I will also forward this one to Whatcom County Planning as part of the public record.
-----------------------------
Labels:
Coal,
Elections,
Energy,
Environment,
Government,
PlanningGrowth,
Politics,
Transportation
Thursday, October 1, 2009
Fairhaven Highlands: DEIS Summary Findings
-----------------
My previous blog on Sep 28 gave a web link to the Draft Environmental Impact Statement [DEIS] released that same day.
Since that time I have reviewed some of that extensive information, received a summary statement [Findings] from comments were that were used on KGMI Radio, and arrived at a few preliminary conclusions of my own about which of these alternatives alternatives seem preferable.
-----------------
First, the Findings:
The major differences among the seven alternatives are the internal road layout and vehicular access to the site, amount of development coverage, and the areas of disruption between forested wetlands.
Significant impacts could occur from conversion of this forested property but there are significant policy trade offs in environmental impacts. For example, the reduction of one type of impact could increase an impact of another type. Examples:
• Not developing the site could result in growth occurring outside city limits, resulting in an increase in greenhouse gas emissions from people driving into the city, the employment center of the County.
• The original alternative (1A) has the most impacts to the environment (wetland and buffer impacts, forest fragmentation, greenhouse gas emissions, etc.). The applicant subsequently proposed an alternative with fewer impacts (2A).
• Building the required “24th Street Connector” would alleviate congestion from increased traffic and provide more circulation in the area but could affect the quiet neighborhood character.
• Similarly, while providing two entrances (as opposed to one across from Viewcrest) and more roadways within the development provide a traffic benefit, they result in more impacts to wetlands and wetland buffers and result in fragmentation of the forest.
• Other than the original alternative, all of the alternatives provide some protection for wetland and wetland buffers, but some species will be lost due to the fragmentation of the contiguous forest. The “split site alternative” (3D) provides the most connectivity, though it’s impacted by the 24th Street Connector.
Mature forested Category I wetlands were identified during the development of the DIES. As a result, wetland buffers 150 feet wide have been suggested as a mitigation measure to protect wetland functions that support a mature ecology and substantial wildlife habitat. Other mitigation measures are proposed for a variety of impacts.
A traffic analysis was conducted for the affected street system, traffic volumes, traffic safety, transit, and non-motorized facilities associated with the site including 30th Street, Chuckanut Drive, Old Fairhaven Parkway, Viewcrest, Old Samish Highway, and 24th Street.
The traffic volume (at full build out) would generate trips ranging from 4,390/day to at most 5,000/day (1A).
----------------------------------
The first 'alternative' given is a no-action alternative, where nothing would be built on this site.
That seems counterproductive since the site is already zoned for residential development and has had an active proposal under consideration since 2005, later modified in 2007.
The main impacts of a 'no action' would be the loss of potential housing within existing city limits, forcing sprawl elsewhere.
To quantify this, the 739 dwelling units proposed in phases are expected to accommodate about 1550 people, or approximately 5% of the population attributed to potential growth between now and 2022.
Related losses would be those accruing to the developer and his partners, the time and effort devoted by tax-paid City government, plus the the very substantial loss of future revenues from taxes, rates, fees, as well as developer-paid public infrastructure, including community enhancing road/trail connectivity.
Then, would come the question of what to do with this property?
Some would have it simply become more city parkland, which is substantially out of the question because of both cost and the lack of available funding.
And, the owner(s) do expect a reasonable return on their valuable investment. If the development plan under consideration does not not produce adequate results, the owners will find recourse, either through sale to others, legal action or otherwise.
No one knows what will eventually occur with the Fairhaven Highlands proposal, but something certainly will, and someone will most likely oppose it.
Years ago, Theodore Roosevelt used the phrase 'the greatest good for the greatest number' in setting goals for our country. That was [and is] a very good policy!
But some, over history have not agreed with how this is determined.
John Muir, for example, fiercely fought the damming of the Tuolumne River at Hetch Hetchy in Yosemite, thinking that pristine river ought to have been preserved in a wild, untouched state forever.
But, another idea prevailed -using the very same policy- that a permanent drinking water supply for San Francisco was equally or even more important.
In the greater scheme of things, both were important goals, but who will doubt having a protected, pure source of drinking isn't the more valuable today?
========================
Alternates 1A and 1B were in the initial 2005 proposal, but at that time, the City added Alternative 1C.
I'm glad they did that because a development this large will cause more congestion to areas already prone to congestion, some even approaching LOS F at times.
And, transportation concurrency with land development is something to take seriously, especially when substantial mitigation is possible.
But, in order to pay for these type of effective transportation mitigation, the developer must find a way in his pro-forma to recover the costs.
2.5.4 Alternative 1C – 2005 Application with Access to 24th Street
Alternative 1C would be developed as described for Alternative 1A, except that the eastern emergency access road connecting to 22nd Street would instead be a fully developed two-lane street connecting the project site to 24th Street. This would involve removing two and a half additional acres of vegetation and adding one and a third more acres of impervious surface than Alternative 1A. Approximately 1,000 square feet of wetland and 72,000 square feet of regulated wetland buffer would be impacted by the 24th Street Connector. Twenty-five acres of 1 Regulated wetlands are those considered to be regulated by the Bellingham Municipal Code Chapter 16.50. See Section 3.4.3 Plants and Animals for more information.
September 2009 Alternatives 2-23
Fairhaven Highlands Draft EISFairhaven Highlands Draft EIS landscaping would be installed, one acre less than Alternative 1A. Alternative 1C would involve the most vegetation removal, wetland and wetland buffer fill, and impervious surface coverage of all development alternatives.
-------------
Later, in 2007, the developer proposed modifications which, among other things, did effectively decrease the impacts of this proposed development.
2.5.5 Alternative 2A – Enhanced Buffer Plan
Under Alternative 2A, the property would be developed based on the proponent’s reports submitted to the City of Bellingham in 2007. The reports describe construction of 17 single- family units and 722 multi-family units. The multi-family units would be a mixture of townhouses and up to 5-story apartment buildings. The project would also include a 4,000- square-foot community building.
Approximately 41 acres of vegetation on-site (50 percent of the property) and half an acre off- site would be removed to accommodate the project, the least amount of vegetation removal from the project area among the development alternatives. Approximately 20 acres on-site (25 percent of the property) and one-third of an acre off-site would be covered by impervious surface including roadways, rooftops, and driveways. Alternative 2A would have the lowest impervious surface coverage of the development alternatives. Twenty-one acres of landscaping would be installed. It is estimated that about 200,000-210,000 cubic yards of soil would be excavated and around 60,000-70,000 cubic yards of soil would be used for fill, with a net off-site export of 140,000 cubic yards.
Alternative 2A includes buffers around most wetland areas that are larger than what is proposed for Alternatives 1A, 1B, and 1C. Approximately 24,000 square feet of wetlands and 65,000 square feet of wetland buffers would be filled, the least amount of fill among the development alternatives.
Vehicular access to the site would be provided on the east side of the existing Chuckanut Drive/Viewcrest Road intersection. Two emergency-only access roadways would be provided to the site (one via Chuckanut Drive, near 16th Street, and one internal road connecting the southeast portion of the site with the northeast portion of the site.
-------------
In the event Alternative 2A was unacceptable, the developer preferred either Alternative 2F or Alternative 4F, as briefly described below.
My own preference is along the lines of Alternative 3D, also shown below.
2.5.6 Alternative 2F – Enhanced Buffer Plan with Additional Road
Under Alternative 2F, the property would be developed as described for Alternative 2A, except that the 16th Street and Wetland JJ connectors would be fully accessible roads, rather than emergency access only. This would result in approximately half an acre more impervious surface than Alternative 2A. Compared to Alternative 2A, the construction of the connectors would result in minimal increases in vegetation removal and wetland and wetland buffer fill.
2.5.7 Alternative 3D – Split Site Alternative
Alternative 3D includes construction of 17 single-family units and 722 multi-family units. The multi-family units would be a mixture of townhouses and apartment buildings up to five stories tall. A 4,000-square-foot community building would also be built.
Approximately 40 acres of on-site vegetation (49 percent of the property) and 3 acres of off-site vegetation would be removed to accommodate the project, the least amount of on-site vegetation
2-24 Alternatives September 2009 removal among the development alternatives. Approximately 22 acres on-site (26 percent of the property) and one and a half acres off-site would be covered by impervious surface including roadways, rooftops, and driveways. Nineteen acres of landscaping would be installed. The amount of soil excavated and used for fill would be similar to Alternative 2A.
The site plan includes buffers around most wetland areas that are larger than what is proposed for Alternatives 1A, 1B, and 1C. Approximately 26,000 square feet of wetlands and 115,000 square feet of wetland buffers would be impacted.
The design of the internal roadway network is similar to Alternative 2F, except that there would not be a road between Wetlands CC1 and KK. Another major difference is that vehicular access would be provided to 24th Street. The remaining features of the roadway network would be the same including vehicular access on the east side of the existing Chuckanut Drive/Viewcrest Road intersection, and a second access farther north on Chuckanut Drive near 16th Street.
2.5.8 Alternative 4F – Enhanced Buffer Plan with Single-family Development in Southern Portion
Alternative 4F is similar to Alternative 2F except that the southern portion of the site would be entirely made up of single-family units, with a larger number of multi-family units clustered in the northern portion. A total of 51 single-family units and 688 multi-family units would be constructed.
The roadway network would be identical to Alternative 2F. The project would have a similar amount of impervious surface coverage as Alternative 2A and 2F. The amount of soil excavated and used for fill would also be similar to Alternative 2A.
Approximately 51 acres of vegetation on-site (62 percent of the property) and a little more than half an acre off-site would be removed. Approximately 26,000 square feet of wetland and 108,000 square feet of wetland buffer would be impacted.
-------------------
Readers should note that the several Alternatives listed in the DEIS were culled from a total of about 30, on the theory that the several selected for inclusion substantially represented most of the reasonable configurations possible.
Also note that NO PREFERRED ALTERNATIVE has yet been determined. That will happen only after the Public Hearings and other due public process has been completed.
It is possible that some mixing and matching of various concepts and components will occur as a result of the public process to come.
These things will become a part of a Final EIS, which would be basis for any official approval action(s).
I hope this synopsis is helpful to those who find it daunting to wade through hundreds of pages of documentation.
While most of us will not have a direct vote in whatever the final outcome may be, we all do have a role to play in fully informing ourselves about what alternatives are being considered and what their relative pros and cons may be.
=======================
My previous blog on Sep 28 gave a web link to the Draft Environmental Impact Statement [DEIS] released that same day.
Since that time I have reviewed some of that extensive information, received a summary statement [Findings] from comments were that were used on KGMI Radio, and arrived at a few preliminary conclusions of my own about which of these alternatives alternatives seem preferable.
-----------------
First, the Findings:
The major differences among the seven alternatives are the internal road layout and vehicular access to the site, amount of development coverage, and the areas of disruption between forested wetlands.
Significant impacts could occur from conversion of this forested property but there are significant policy trade offs in environmental impacts. For example, the reduction of one type of impact could increase an impact of another type. Examples:
• Not developing the site could result in growth occurring outside city limits, resulting in an increase in greenhouse gas emissions from people driving into the city, the employment center of the County.
• The original alternative (1A) has the most impacts to the environment (wetland and buffer impacts, forest fragmentation, greenhouse gas emissions, etc.). The applicant subsequently proposed an alternative with fewer impacts (2A).
• Building the required “24th Street Connector” would alleviate congestion from increased traffic and provide more circulation in the area but could affect the quiet neighborhood character.
• Similarly, while providing two entrances (as opposed to one across from Viewcrest) and more roadways within the development provide a traffic benefit, they result in more impacts to wetlands and wetland buffers and result in fragmentation of the forest.
• Other than the original alternative, all of the alternatives provide some protection for wetland and wetland buffers, but some species will be lost due to the fragmentation of the contiguous forest. The “split site alternative” (3D) provides the most connectivity, though it’s impacted by the 24th Street Connector.
Mature forested Category I wetlands were identified during the development of the DIES. As a result, wetland buffers 150 feet wide have been suggested as a mitigation measure to protect wetland functions that support a mature ecology and substantial wildlife habitat. Other mitigation measures are proposed for a variety of impacts.
A traffic analysis was conducted for the affected street system, traffic volumes, traffic safety, transit, and non-motorized facilities associated with the site including 30th Street, Chuckanut Drive, Old Fairhaven Parkway, Viewcrest, Old Samish Highway, and 24th Street.
The traffic volume (at full build out) would generate trips ranging from 4,390/day to at most 5,000/day (1A).
----------------------------------
The first 'alternative' given is a no-action alternative, where nothing would be built on this site.
That seems counterproductive since the site is already zoned for residential development and has had an active proposal under consideration since 2005, later modified in 2007.
The main impacts of a 'no action' would be the loss of potential housing within existing city limits, forcing sprawl elsewhere.
To quantify this, the 739 dwelling units proposed in phases are expected to accommodate about 1550 people, or approximately 5% of the population attributed to potential growth between now and 2022.
Related losses would be those accruing to the developer and his partners, the time and effort devoted by tax-paid City government, plus the the very substantial loss of future revenues from taxes, rates, fees, as well as developer-paid public infrastructure, including community enhancing road/trail connectivity.
Then, would come the question of what to do with this property?
Some would have it simply become more city parkland, which is substantially out of the question because of both cost and the lack of available funding.
And, the owner(s) do expect a reasonable return on their valuable investment. If the development plan under consideration does not not produce adequate results, the owners will find recourse, either through sale to others, legal action or otherwise.
No one knows what will eventually occur with the Fairhaven Highlands proposal, but something certainly will, and someone will most likely oppose it.
Years ago, Theodore Roosevelt used the phrase 'the greatest good for the greatest number' in setting goals for our country. That was [and is] a very good policy!
But some, over history have not agreed with how this is determined.
John Muir, for example, fiercely fought the damming of the Tuolumne River at Hetch Hetchy in Yosemite, thinking that pristine river ought to have been preserved in a wild, untouched state forever.
But, another idea prevailed -using the very same policy- that a permanent drinking water supply for San Francisco was equally or even more important.
In the greater scheme of things, both were important goals, but who will doubt having a protected, pure source of drinking isn't the more valuable today?
========================
Alternates 1A and 1B were in the initial 2005 proposal, but at that time, the City added Alternative 1C.
I'm glad they did that because a development this large will cause more congestion to areas already prone to congestion, some even approaching LOS F at times.
And, transportation concurrency with land development is something to take seriously, especially when substantial mitigation is possible.
But, in order to pay for these type of effective transportation mitigation, the developer must find a way in his pro-forma to recover the costs.
2.5.4 Alternative 1C – 2005 Application with Access to 24th Street
Alternative 1C would be developed as described for Alternative 1A, except that the eastern emergency access road connecting to 22nd Street would instead be a fully developed two-lane street connecting the project site to 24th Street. This would involve removing two and a half additional acres of vegetation and adding one and a third more acres of impervious surface than Alternative 1A. Approximately 1,000 square feet of wetland and 72,000 square feet of regulated wetland buffer would be impacted by the 24th Street Connector. Twenty-five acres of 1 Regulated wetlands are those considered to be regulated by the Bellingham Municipal Code Chapter 16.50. See Section 3.4.3 Plants and Animals for more information.
September 2009 Alternatives 2-23
Fairhaven Highlands Draft EISFairhaven Highlands Draft EIS landscaping would be installed, one acre less than Alternative 1A. Alternative 1C would involve the most vegetation removal, wetland and wetland buffer fill, and impervious surface coverage of all development alternatives.
-------------
Later, in 2007, the developer proposed modifications which, among other things, did effectively decrease the impacts of this proposed development.
2.5.5 Alternative 2A – Enhanced Buffer Plan
Under Alternative 2A, the property would be developed based on the proponent’s reports submitted to the City of Bellingham in 2007. The reports describe construction of 17 single- family units and 722 multi-family units. The multi-family units would be a mixture of townhouses and up to 5-story apartment buildings. The project would also include a 4,000- square-foot community building.
Approximately 41 acres of vegetation on-site (50 percent of the property) and half an acre off- site would be removed to accommodate the project, the least amount of vegetation removal from the project area among the development alternatives. Approximately 20 acres on-site (25 percent of the property) and one-third of an acre off-site would be covered by impervious surface including roadways, rooftops, and driveways. Alternative 2A would have the lowest impervious surface coverage of the development alternatives. Twenty-one acres of landscaping would be installed. It is estimated that about 200,000-210,000 cubic yards of soil would be excavated and around 60,000-70,000 cubic yards of soil would be used for fill, with a net off-site export of 140,000 cubic yards.
Alternative 2A includes buffers around most wetland areas that are larger than what is proposed for Alternatives 1A, 1B, and 1C. Approximately 24,000 square feet of wetlands and 65,000 square feet of wetland buffers would be filled, the least amount of fill among the development alternatives.
Vehicular access to the site would be provided on the east side of the existing Chuckanut Drive/Viewcrest Road intersection. Two emergency-only access roadways would be provided to the site (one via Chuckanut Drive, near 16th Street, and one internal road connecting the southeast portion of the site with the northeast portion of the site.
-------------
In the event Alternative 2A was unacceptable, the developer preferred either Alternative 2F or Alternative 4F, as briefly described below.
My own preference is along the lines of Alternative 3D, also shown below.
2.5.6 Alternative 2F – Enhanced Buffer Plan with Additional Road
Under Alternative 2F, the property would be developed as described for Alternative 2A, except that the 16th Street and Wetland JJ connectors would be fully accessible roads, rather than emergency access only. This would result in approximately half an acre more impervious surface than Alternative 2A. Compared to Alternative 2A, the construction of the connectors would result in minimal increases in vegetation removal and wetland and wetland buffer fill.
2.5.7 Alternative 3D – Split Site Alternative
Alternative 3D includes construction of 17 single-family units and 722 multi-family units. The multi-family units would be a mixture of townhouses and apartment buildings up to five stories tall. A 4,000-square-foot community building would also be built.
Approximately 40 acres of on-site vegetation (49 percent of the property) and 3 acres of off-site vegetation would be removed to accommodate the project, the least amount of on-site vegetation
2-24 Alternatives September 2009 removal among the development alternatives. Approximately 22 acres on-site (26 percent of the property) and one and a half acres off-site would be covered by impervious surface including roadways, rooftops, and driveways. Nineteen acres of landscaping would be installed. The amount of soil excavated and used for fill would be similar to Alternative 2A.
The site plan includes buffers around most wetland areas that are larger than what is proposed for Alternatives 1A, 1B, and 1C. Approximately 26,000 square feet of wetlands and 115,000 square feet of wetland buffers would be impacted.
The design of the internal roadway network is similar to Alternative 2F, except that there would not be a road between Wetlands CC1 and KK. Another major difference is that vehicular access would be provided to 24th Street. The remaining features of the roadway network would be the same including vehicular access on the east side of the existing Chuckanut Drive/Viewcrest Road intersection, and a second access farther north on Chuckanut Drive near 16th Street.
2.5.8 Alternative 4F – Enhanced Buffer Plan with Single-family Development in Southern Portion
Alternative 4F is similar to Alternative 2F except that the southern portion of the site would be entirely made up of single-family units, with a larger number of multi-family units clustered in the northern portion. A total of 51 single-family units and 688 multi-family units would be constructed.
The roadway network would be identical to Alternative 2F. The project would have a similar amount of impervious surface coverage as Alternative 2A and 2F. The amount of soil excavated and used for fill would also be similar to Alternative 2A.
Approximately 51 acres of vegetation on-site (62 percent of the property) and a little more than half an acre off-site would be removed. Approximately 26,000 square feet of wetland and 108,000 square feet of wetland buffer would be impacted.
-------------------
Readers should note that the several Alternatives listed in the DEIS were culled from a total of about 30, on the theory that the several selected for inclusion substantially represented most of the reasonable configurations possible.
Also note that NO PREFERRED ALTERNATIVE has yet been determined. That will happen only after the Public Hearings and other due public process has been completed.
It is possible that some mixing and matching of various concepts and components will occur as a result of the public process to come.
These things will become a part of a Final EIS, which would be basis for any official approval action(s).
I hope this synopsis is helpful to those who find it daunting to wade through hundreds of pages of documentation.
While most of us will not have a direct vote in whatever the final outcome may be, we all do have a role to play in fully informing ourselves about what alternatives are being considered and what their relative pros and cons may be.
=======================
Labels:
Government,
Greenways,
Neighborhoods,
PlanningGrowth,
Politics,
Sunshine,
Transportation
Wednesday, September 16, 2009
Bellingham's New Transportation Commission
-----------------------------
A recent Herald article reports Bellingham is seeking applicants for new Transportation Commission
The City's website provides information on its new Transportation Commission:
This sub-website explains the rationale behind establishing this new Commission:
Basically, the new Commission expands its previous role(s) into longer range planning, while also continuing the prior functions of advising the City on Bicycle/Pedestrian and Parking issues.
Because the Growth Management Act requires Transportation CONCURRENCY in planning for Growth, the new Commission's role is intended to help fill some gaps this effort.
For example, I can see some clear possibilities of jointly meeting with the Planning Commission, the Whatcom Council of Governments [Regional Transportation Planning Agency], the Waterfront Redevelopment Project, and Public Works regarding the City's annual Transportation Improvement Plan [TIP].
Because of the increased depth of scope envisioned, care must be taken in selecting members willing to undertake these important assignments.
Additionally, use may be made of task forces and sub work groups as may be necessary and prudent.
Transportation projects often share at least two main characteristics; they address multiple long term needs and they tend to be relatively expensive.
Both of these are reasons that strongly justify an expanded Transportation Commission.
I hope citizens will seriously consider volunteering to be a part of this new idea.
Although the deadline for initial applications is September 18, there will be new appointments made at least yearly for the first three years.
A normal term of appointment, thereafter, is 3 years.
-----------------------------
The following Questionnaire provides some food for thought for potential Applicants:
City of Bellingham
Transportation Commission Inventory
A broad cross-section of our community is expected to declare interest in the nine (9) seats that are available on Bellingham’s new Transportation Commission. Please help us assess the attributes you could bring to the Commission by highlighting your vision, knowledge, philosophy and experience related to transportation issues while answering the following questions. Please keep your responses to a total of no more than three one-sided pages, using a font of at least 11 points. Submit your responses to the Mayor’s Office, 210 Lottie Street, Bellingham, WA 98225. Thank you.
1. As part of a 9-person body, what unique perspective or experience do you feel you would bring to the Commission?
2. What are the challenges, as you see it, to meeting the transportation needs of Bellingham and even Whatcom County?
3. What are some specific ways the city can address these issues or challenges?
4. If you had a symbolic $100 in public money to spend on any transportation system improvements you saw fit, how would you allocate the sum (use whole dollars only)?
5. What transportation modes do you personally use as...
Your primary means?
Periodic alternative transportation (e.g. once a month or more)?
Recreation?
6. If not selected for one of the Commission’s nine seats, would you be willing to serve on a select limited-term work group or a standing subcommittee? Check one: 0 YES 0 NO
Name: Phone:
-----------------------------
A recent Herald article reports Bellingham is seeking applicants for new Transportation Commission
The City's website provides information on its new Transportation Commission:
This sub-website explains the rationale behind establishing this new Commission:
Basically, the new Commission expands its previous role(s) into longer range planning, while also continuing the prior functions of advising the City on Bicycle/Pedestrian and Parking issues.
Because the Growth Management Act requires Transportation CONCURRENCY in planning for Growth, the new Commission's role is intended to help fill some gaps this effort.
For example, I can see some clear possibilities of jointly meeting with the Planning Commission, the Whatcom Council of Governments [Regional Transportation Planning Agency], the Waterfront Redevelopment Project, and Public Works regarding the City's annual Transportation Improvement Plan [TIP].
Because of the increased depth of scope envisioned, care must be taken in selecting members willing to undertake these important assignments.
Additionally, use may be made of task forces and sub work groups as may be necessary and prudent.
Transportation projects often share at least two main characteristics; they address multiple long term needs and they tend to be relatively expensive.
Both of these are reasons that strongly justify an expanded Transportation Commission.
I hope citizens will seriously consider volunteering to be a part of this new idea.
Although the deadline for initial applications is September 18, there will be new appointments made at least yearly for the first three years.
A normal term of appointment, thereafter, is 3 years.
-----------------------------
The following Questionnaire provides some food for thought for potential Applicants:
City of Bellingham
Transportation Commission Inventory
A broad cross-section of our community is expected to declare interest in the nine (9) seats that are available on Bellingham’s new Transportation Commission. Please help us assess the attributes you could bring to the Commission by highlighting your vision, knowledge, philosophy and experience related to transportation issues while answering the following questions. Please keep your responses to a total of no more than three one-sided pages, using a font of at least 11 points. Submit your responses to the Mayor’s Office, 210 Lottie Street, Bellingham, WA 98225. Thank you.
1. As part of a 9-person body, what unique perspective or experience do you feel you would bring to the Commission?
2. What are the challenges, as you see it, to meeting the transportation needs of Bellingham and even Whatcom County?
3. What are some specific ways the city can address these issues or challenges?
4. If you had a symbolic $100 in public money to spend on any transportation system improvements you saw fit, how would you allocate the sum (use whole dollars only)?
5. What transportation modes do you personally use as...
Your primary means?
Periodic alternative transportation (e.g. once a month or more)?
Recreation?
6. If not selected for one of the Commission’s nine seats, would you be willing to serve on a select limited-term work group or a standing subcommittee? Check one: 0 YES 0 NO
Name: Phone:
-----------------------------
Thursday, August 27, 2009
Growth Management: An Exercise In Futility?
------------------------
We constantly hear reams of blather about minimizing sprawl by densifying urban centers, but when you get down to it people living in those urban centers don't want changes that affect their 'neighborhood character' and their 'quality of life'.
So, are the concepts of sprawl and infill mutually exclusive?
Are the real games being played 'drive until you qualify' and 'somebody else's problem musical chairs'?
Lot's of folks get excited about these discussions, but the answer almost always means 'somebody else' gets to shoulder the responsibility, an externalization that has become ludicrous.
No one benefits from this constant 'push-me-pull-you' exercise, except maybe those cynics who enjoy seeing incessant senseless turmoil that is almost always non-productive.
Just look at the planning efforts that have been undertaken for years.
How many have realized what was intended?
How many have become dusty, forgotten and expensive shelf art?
Mostly they seem to be palliatives and placebos that do reflect some desirable outcomes, but lack the commitment -and teeth- to meet the objectives intended.
And, after repeated failings to produce results that seem reasonable, fair and predictable, who can be faulted for losing confidence in the process used to determine these growth planning exercises?
Bellingham's current debate with Whatcom County about what proportion of projected growth it should plan to accommodate is just the latest example.
Whatcom County thinks the City ought to do a better job of infilling existing neighborhoods, and -of course- they are correct.
But, do these folks have a clue as to what that simple concept entails?
I don't think so!
If you think existing neighborhoods are likely to willing embrace significant new density, there is a bridge for sale in Brooklyn.
Of course, there are exceptions; high-rise buildings in downtown areas; redevelopment areas like the waterfront; newly annexed areas -accepted on the condition of urban levels of development are the main three that come to mind.
Yet, each of these also has hurdles to negotiate.
• Downtown becomes an attractive living place for folks who like walking to work, shopping and entertainment, and who don't opt for home and lawn maintenance.
Then, there's the little matter of high-rises impacting someone else's view and/or solar access. Otherwise, they are creating a new neighborhood character that is inherently denser and vertical.
• Redevelopment sites like the Waterfront require major investments from public and private funds, and they take time to materialize. Until necessary cleanup, construction and connections are settled, these sites wont likely be fun places to work, live, shop or recreate, all of which make infill uncertain. But, a new neighborhood character will eventually emerge that will utilize access to our shoreline and conveniently connect with the existing downtown.
• Newly annexed areas that are zoned for urban development also must be built in phases and require transportation corridors to connect them with existing urban centers. But, that can certainly be done even though some may think it strange that it happens on the outskirts of the City. Just think of all those ancient and medieval towns where abrupt walls were all the rage to keep out the barbarians and protect the residents! Since there is no existing neighborhood, its character gets a chance to be created, and its density can be determined with more certainty to be urban.
• Of course, there are a few areas that already exist within the City where significant infill is not only possible, but logical.
Several years ago, the Birch Street development was approved with the potential for its maximum allowable 176 new dwelling units, providing a second, full-time access road was provided. That process was painful, particularly to existing neighbors who had grown accustomed to relative quiet and uncongested living next to a forested area that they, or the City, did not own.
REMIND you of another place? Chuckanut Ridge? If the City doesn't allow infill where zoning allows it, then the County is right in its assessment that more land supply is wasteful and unjustified. But, the County can't force the City to take infill, just like the County can't force itself to prevent rural sprawl.
---------------------
Recently, a number of articles on Crosscut have addressed this issue, using Seattle and its surrounds as examples.
Readers may enjoy links to some of these treatises, especially today's piece by Douglas MacDonald entitled Our region is losing the race against sprawl on the related transportation issue.
Other Crosscut links are Dense, denser, densest and
Why Seattle won't grow as fast as planners say
---------------------
The close connection between Transportation and Growth Planning is well established, at least in principle.
The problem is in actually understanding and achieving what is meant by concurrency.
To that end, I'm pleased that the City of Bellingham has now bought into the idea of a Transportation Commission to advise it on how best to fully utilize the Transportation tools it has in planning for future growth.
The Herald's article 'Bellingham seeks applicants for new Transportation Commission' explains this idea further.
I'm glad the City has decided to go forward with more focus on Transportation Oriented Development, as was discussed over 2 years ago.
I may even apply myself for one of the 9 seats envisioned.
-----------------------------------
We constantly hear reams of blather about minimizing sprawl by densifying urban centers, but when you get down to it people living in those urban centers don't want changes that affect their 'neighborhood character' and their 'quality of life'.
So, are the concepts of sprawl and infill mutually exclusive?
Are the real games being played 'drive until you qualify' and 'somebody else's problem musical chairs'?
Lot's of folks get excited about these discussions, but the answer almost always means 'somebody else' gets to shoulder the responsibility, an externalization that has become ludicrous.
No one benefits from this constant 'push-me-pull-you' exercise, except maybe those cynics who enjoy seeing incessant senseless turmoil that is almost always non-productive.
Just look at the planning efforts that have been undertaken for years.
How many have realized what was intended?
How many have become dusty, forgotten and expensive shelf art?
Mostly they seem to be palliatives and placebos that do reflect some desirable outcomes, but lack the commitment -and teeth- to meet the objectives intended.
And, after repeated failings to produce results that seem reasonable, fair and predictable, who can be faulted for losing confidence in the process used to determine these growth planning exercises?
Bellingham's current debate with Whatcom County about what proportion of projected growth it should plan to accommodate is just the latest example.
Whatcom County thinks the City ought to do a better job of infilling existing neighborhoods, and -of course- they are correct.
But, do these folks have a clue as to what that simple concept entails?
I don't think so!
If you think existing neighborhoods are likely to willing embrace significant new density, there is a bridge for sale in Brooklyn.
Of course, there are exceptions; high-rise buildings in downtown areas; redevelopment areas like the waterfront; newly annexed areas -accepted on the condition of urban levels of development are the main three that come to mind.
Yet, each of these also has hurdles to negotiate.
• Downtown becomes an attractive living place for folks who like walking to work, shopping and entertainment, and who don't opt for home and lawn maintenance.
Then, there's the little matter of high-rises impacting someone else's view and/or solar access. Otherwise, they are creating a new neighborhood character that is inherently denser and vertical.
• Redevelopment sites like the Waterfront require major investments from public and private funds, and they take time to materialize. Until necessary cleanup, construction and connections are settled, these sites wont likely be fun places to work, live, shop or recreate, all of which make infill uncertain. But, a new neighborhood character will eventually emerge that will utilize access to our shoreline and conveniently connect with the existing downtown.
• Newly annexed areas that are zoned for urban development also must be built in phases and require transportation corridors to connect them with existing urban centers. But, that can certainly be done even though some may think it strange that it happens on the outskirts of the City. Just think of all those ancient and medieval towns where abrupt walls were all the rage to keep out the barbarians and protect the residents! Since there is no existing neighborhood, its character gets a chance to be created, and its density can be determined with more certainty to be urban.
• Of course, there are a few areas that already exist within the City where significant infill is not only possible, but logical.
Several years ago, the Birch Street development was approved with the potential for its maximum allowable 176 new dwelling units, providing a second, full-time access road was provided. That process was painful, particularly to existing neighbors who had grown accustomed to relative quiet and uncongested living next to a forested area that they, or the City, did not own.
REMIND you of another place? Chuckanut Ridge? If the City doesn't allow infill where zoning allows it, then the County is right in its assessment that more land supply is wasteful and unjustified. But, the County can't force the City to take infill, just like the County can't force itself to prevent rural sprawl.
---------------------
Recently, a number of articles on Crosscut have addressed this issue, using Seattle and its surrounds as examples.
Readers may enjoy links to some of these treatises, especially today's piece by Douglas MacDonald entitled Our region is losing the race against sprawl on the related transportation issue.
Other Crosscut links are Dense, denser, densest and
Why Seattle won't grow as fast as planners say
---------------------
The close connection between Transportation and Growth Planning is well established, at least in principle.
The problem is in actually understanding and achieving what is meant by concurrency.
To that end, I'm pleased that the City of Bellingham has now bought into the idea of a Transportation Commission to advise it on how best to fully utilize the Transportation tools it has in planning for future growth.
The Herald's article 'Bellingham seeks applicants for new Transportation Commission' explains this idea further.
I'm glad the City has decided to go forward with more focus on Transportation Oriented Development, as was discussed over 2 years ago.
I may even apply myself for one of the 9 seats envisioned.
-----------------------------------
Labels:
Annexation,
Neighborhoods,
PlanningGrowth,
Transportation,
Waterfront
Subscribe to:
Posts (Atom)
